Design Template: Small
-
Estimate: One day to a week
-
Notes:
- When creating the issue, use the label
design-estimated-SM
- Useful when design resources are short, but the project needs to be moved forward. In this case, a small, consultive effort may be undertaken, a problem is small enough to require only design guidance
- When creating the issue, use the label
✂️ -------------------------
## Design process
- Estimate: One day to a week
- Weighting factors:
- Note: A small issue should not be high impact and high certainty.
- HIGH|MEDIUM|LOW risk
- HIGH|MEDIUM|LOW clarity
### Discover
- [ ] Existing customer feedback - Link
- [ ] Product and/or engineering provide direction and/or feedback
### Define
- [ ] Github issue
- [ ] Design challenge
### Design
- [ ] Low fidelity design - Link
- [ ] High fidelity design using design system - Figma
- [ ] Non-visual design guidance captured in the issue
- [ ] Prototype - Link
- [ ] Designer review
### Testing
- [ ] Hallway testing - Link
- [ ] Usertesting.com task based evaluation - Link
### Deliver
- [ ] Loom - Link
- [ ] Team review
- [ ] Design team review
- [ ] QA - Link
### Measure
- [ ] Metrics defined in the Figma file ([i](https://handbook.sourcegraph.com/departments/product-engineering/product/design/metrics/defining-metrics/)) - Link
- [ ] Followup task will analyze metrics to ensure successful completion - Link
✂️ -------------------------